How do you manage engineering change orders (ECO) for future iterations?

Update Time:2026/10/23

Yes. We control changes by drawing revision and written approval. For each change we will state the effect on tooling, BOM, price, lead time and existing stock before implementation. Please route all changes through one authorized contact so no informal message reaches production as an uncontrolled revision.